Knock Out Drums (KOD) Ready for Dispatch

Deep Wells Development Project,Daharki

Deep Wells Development Project,Daharki

Sr. No. Principal/Client Project Name Project Value (Millions)
1

Mari Petroleum Company Limited

Construction of 20’ x 5000 Meters Road at Zarghun, job includes preparation of the existing base course layer, application of tuck coat, Preparation and placing of premix, rolling & finishing surface.

107 Million
2

Sunrise Enterprises

Construction of Building, job includes Break Ground. Excavation. Foundation. Concrete Forms. Pour Foundation Wall. Concrete Slab Pour. Gravel. Water Barrier. Rigid Foam. Utilities. Sewer, Electrical, Water, Gas. Framing. Sheathing. Roof. Stairs. Windows. Roofing. Weather Resistant Barrier. Rain Screen. Rough Plumbing. 80 Million

3

NN Industries

Construction of Office Building, Boundary Wall & Security Gurd Rooms 46 Million

4

Mari Petroleum Company Limited

Construction of U & O/H water storage tanks, Parking & Equipment Sheds, Equipment Room, Rest Room Guard Room, Kitchen, Soaking pit & Septic tank. 78 Million

5

Pakistan Petroleum Limited/DES Services

All Civil Works of Construction of Access Road Well Location for 3rd Exploratory Well Gambat South 61 Million
Sr. No.Principal/ ClientProject  NameProject Value (Millions)
1Mari Petroleum Company Limited

Mechanical/Electrical/ Civil Works for Development of GTH Facilities, including erection/installation of following equipment’s: 

Manifold = Goru-B, Tipu, HRL, Bhittai

Inlet Separators Area = Tipu, Goru-B, HRL

Metering = Tipu Sales Metering, HRL Sales Metering, Goru-B Sales metering

TIPU UOP 2 Stage Membrane Area = First Stage Membrane, Second Stage Membrane, Gas Exchanger, Filter Coalescer, Guard Bed, Particle Filter, Regeneration Gas Cooler, Regeneration Gas Separator, Condensate Heater, Condensate Flash Tank, Memguard Absorber with Valve Skid, Regeneration Gas Blower, Filter Coalescer, Particle Filter ( A/B, Booster Compressors, Tipu Recycle Compressor, Re-Generation Gas Heater, Membrane Preheater, TIPU Raw Gas Metering

Goru-B Single Stage Membrane = Single Stage Membrane, Pre-Treatment, Amine Unit, Goru-B Raw Gas Metering, Dehydration Skid, Pre-Heater Skid, Goru-B Hot Oil Heater Skid, Hot Oil System, Hot Oil Sump Vessel & Pump, Hot Oil Circulation Pump Skid, Side Stream Filters Skid

HRL = HRL Raw Gas Metering, HRL Compressors, Dehydration Skid, Hot Oil  Expansion Vessel Skid, HRL Hot Oil Heater Skid, Amine Unit, HRL Hot Oil Circulation Pump Skid, HRL Side Stream Filters Skid.                 

FEC & Sales Gas Compressors Area = FEC Area, Sales Gas Compressors.

Flare & Vent = Flare Stack, Flame Front Generator, Flare KOD & Pump, Vent Stack.

Condensate Storage & Loading Gantry = Condensate Degasser Skid, Condensate Storage Tank, Condensate Loading Pump, Gantry.

Utility Area = C.I injection Skid, Foam Skid, Fuel Gas Scrubber Skid, Instrument Air Skid, Instrument Air Vessel, Raw Water Pump Skid, Raw/Fire Water Tank, Fire Water Pump Skid, Water Storage Reservoir, Raw Water Transfer Pump and RO Feed Pump Skid, RO Unit, Nitrogen Generator, Demin Water Tank / Pump Skid, Water Degasser Skid, Close Drain System, CPI Separator, Gauging Yank, Evaporation Pond, Storm Water Evaporation Pond, Rejected Water Pond, Water Re-Injection Pump,  Generators, MCC Room, Control Room & Office Building, Workshop, Storage Yard, Car Parking, Security Room, Amine Storage Tank, Amine Surcharge & Transfer pump Skid, Portable Water Pump and Wind Sock.

917.6 Million
2Pakistan State Oil Co. LtdEPCC Job for New Development of 03 No. (1x 12,000 & 2x5500 MT respectively) Steel Storage Tanks at PSO Shikarpur Installation.485.9 Million
3Mari Petroleum Company Limited

Mechanical/Electrical/ Civil Works at Zarghun Field Development Project(25 MMCF Dehydration, Amine Sweetening & Dew Point)

Installation of Instrument Gas Package, Inhibition Packages, Well Head Control Panel.

Pre-Fabrication and Welding works of 1”, 2”, 4”, 6”, 8”, 10” & 12” dia piping spools of various schedules in Carbon Steel & Duplex Steel.

Supply and installation of Steel Structure Racks.

RCC works, including Excavation, Supply of civil material, pouring, etc. for foundation /sleepers.

Erection & Installation of :

Separation Battery

Separation Metering Skid

Amine Sweetening Unit

Gas Dehydration Unit

Hydrocarbon Dew point Control Unit

Sales Gas Metering Skid

Instrumentation Package

Fuel Gas Package

Flare KOD and Flare Stack

Condensate Pumps.

All instrumentation tubing works.

On-site Construction and installation of Slope Tank.

Construction of loading Gantry for Condensate.

Heat Treatment of Welded Joints as per NACE MR0175

401 Million
4Pakistan State Oil Co. LtdRehabilitation of 7 x Large dia Storage Tanks#407, 410 413 428, 432, 435 & 438 at Keamari Termincal-A305 Million
5Pakistan State Oil Co. LtdUpgradation of Fire Fighting System at Zulfiqarabad Oil Terminal (ZOT).298 Million
6Pakistan State Oil Co. LtdRehabilitation of Large Dia Storage Tanks #202, 204, 205,208,209 & 213 at PSO Keamari Terminal-C.272 Million
7Pakistan Petroleum LimitedConstruction / laying/ Welding & installation of Well NASR CRA Pipe line including Duplex wellhead Surface fittings / piping & associated civil works at Gambat south field in Sindh.212.6 Million
8Mari Petroleum Company LimitedInstallation of Dehydration Plant125 MMscfd Installation of 3 Phase Separators Installation of Flow Control Valves Installation of Pressure Control Valves Installation of Pressure Safety Valves, Installation of 10" & 12" Metering Skid. Fabrication, Erection & Welding of Duplex & Carbon Steel Piping Spools for Well Head Facilities & CMF,Pipe Stringing, Fabrication & Welding, Trench Preparation, Weld Joint Coating, Pipeline Lowering, Backfilling & Restoration of ROW, Hydrostatic Testing , Pigging, Commissioning & Civil Works.72 Million
9Pakistan Petroleum LimitedWelding / Construction / Laying of Various Diameters Underground / Aboveground Carbon Steel New Pipelines Adhi-32 Phase-II at Adhi Field.70.8 Million
10Pakistan State Oil Co. LtdDevelopment of 8” Dia Pipeline Link between PARCO and PSO Installations at Shikarpur.64.2 Million
11Mari Petroleum Company Limited

Mechanical/Electrical/ Civil Works at Sujawal Field Development Project(10 MMCF Dehydtation Plant)

Pre-Fabrication and Welding works of 1”, 2”, 4”, 6”, 8”, 10” & 12” dia piping spools of various schedules in Carbon Steel & Duplex Steel.

Supply and installation of Steel Structure Racks.

RCC works, including Excavation, Supply of civil material, pouring, etc. for foundation /sleepers.

Erection & Installation of :

Separation Battery

Separation Metering Skid

Amine Sweetening Unit

Gas Dehydration Unit

Hydrocarbon Dew point Control Unit

Sales Gas Metering Skid

Instrumentation Package

Fuel Gas Package

Flare KOD and Flare Stack

Condensate Pumps.

All instrumentation tubing works.

On-site Construction and installation of Slope Tank.

Construction of loading Gantry for Condensate. (P.O#7100009788). Successfully Completed.

59 Million
12Mari Petroleum Company Limited

Welding  & Construction of 4” Dia Pipeline, including Excavation, Stringing, Fabrication,  Heat Shrink Sleeve Application, Hydrostatic Testing, Laying  of Pipeline and Back filing of trench, Pre-Fabrication and Welding works of 1”, 2”, 4”, 6”, 8”dia piping spools of various schedules in Carbon Steel.

Supply and installation of Steel Structure Racks at Halini Field.

55.09 Million
13Mari Petroleum Company Limited

Mechanical/ Civil Works at Sujawal Field Development Project(20MMCF Amine Sweetening & Hydrocarbon Dew Point Unit):

Pre-Fabrication and Welding works of 1”, 2”, 4”, 6”, 8”dia piping spools of various schedules in Carbon Steel & Duplex Steel.

Supply and installation of Steel Structure Racks.

RCC works, including Excavation, Supply of civil material, pouring, etc. for foundation /sleepers.

Production  Metering Skid

Amine Sweetening Unit

Hydrocarbon Dew point Control Unit

Installation of Propane Vessel

Flare Stack

Condensate Pumps.

All instrumentation tubing works.

On-site Construction and installation of Slope Tank.

Pressure testing of ASU and MRU Commissioning of ASU and HCDPU

53.8 Million
14Pakistan Petroleum LimitedWelding/ Construction/ Laying of Various Diameters Underground / Aboveground Carbon Steel New / Replacement of Pipelines & Inlet /Outlet connection for 05 Nos. (A-17, A-15, A-18, A-14, A-05 & A-11 FL) of Noodle Compressors.49 Million
15Pakistan State Oil Co. LtdRehabilitation of 20" dia. Tanker Discharge Line at OP-II & OP-III, Keamari.39.6 Million
16Pakistan Petroleum LimitedWelding / Construction / Laying of Underground / Aboveground Carbon Steel New Pipeline Adhi-17-S.34.2 Million
17

 

 

 

Mari Petroleum Company Limited

 

 

 

EPC Services for Mechanical Works at Kalabagh A-1 Oil Field(Field Development Project):

Pre-Fabrication and Welding works of 1”, 2”, 4”, 8”, dia piping spools of various schedules in Carbon Steel l.

Supply and installation of Steel

Installation and commissioning of Jet Pump

Installation of Solo Vessel along with accumulator

Installation & Commissioning  of Three Phase Separator

Installation and commissioning of Oil Heater

Installation of Loading Pumps

Erection of portable storage tanks

Supply of Material and Pre-fabrication, welding and installation of Loading Gantry along with Loading Gantry Shed.

Hydro testing of Piping and Equipment’s(Solo Vessel, Three phase Separator

34.2  Million
18Mari Petroleum Company Limited

Mechanical/ Civil Works at Halini Oil Field, Installation of Artificial Gas Lift Compressor (Arial 4 Stroke 694 HP) Project:

Pre-Fabrication and Welding works of 1”, 2”, 4”, 6”, dia piping spools of various schedules in Carbon Steel l.

Supply and installation of Steel Structure for Compressor Shed

RCC works, including Excavation, Supply of civil material, pouring, etc. for foundation along with Non Shrinkable Grouting for Compressor

Pressure testing of Compressor.

32.9 Million
19Mari Petroleum Company Limited

 Installation Compressor along with Fabrication and Welding works of 1”, 2”, 4”, 6” dia piping spools of various schedules in Carbon Steel.

Supply and installation of Steel Structure Racks.

RCC works at Zarghun Field, near Quetta.

32.6 Million
20Mari Petroleum Company LimitedWelding & Construction of 6” Dia Gas Pipeline, including Excavation, Stringing, Fabrication, Heat Shrink Sleeve Application, Hydrostatic Testing, Laying of Pipeline and Back filing of trench, Pre-Fabrication and Welding works of 1”, 2”, 4”, 6”, 8”dia piping spools of various schedules in Carbon Steel at Sujawal Field.30 Million
21Oil and Gas Development Company Limited

Fabrication/ Construction& Erection of Plant Piping of Various Dia's at OGDCL Sinjhoro Gas Condensate Field, Sanghar.

Piping Work of Dehydration Unit

Piping Work of Amine Sweetening Unit

Piping Work of LPG Bullets

Piping Work of HCDPU

Piping Work of Metering Skids

Piping Work of Hot Oil Heater

Piping Work of Knock Out Drum & Flare Stack

Piping Work of Instrument Air Gas Compressor

Construction of Loading Gantry

Hydro testing of Pipelines along with pressure water flushing.

Structural Works, Pipe Racks, Shades, etc.

25 Million
22Mari Petroleum Company Limited

Mechanical Construction Works for Installation of  Dehydration Plant  ( 25 MMCSFD )Hook-Up at Sujawal Gas Field including Pre-Fabrication and Welding works of 1”, 2”, 4”, 6”, 8”dia piping spools of various schedules in Carbon Steel.

Supply and installation of Steel Structure Racks.

RCC works, including Excavation, Supply of civil material, pouring, etc. for foundation /sleepers.

28.1 Million
23Mari Petroleum Company LimitedDesign, Engineering, Fabrication, Supply & Hook up of 2x 1000 bbls Gun Barrel Separators for Khost-3 & Welding/ Fabrication Works at Khost-3 (P.O#7100009981).24.7 Million
24Pakistan Petroleum LimitedWelding / Construction / Laying of Dia 6" Underground / Aboveground Carbon Steel New / Replacement Pipelines Adhi-13 at Adhi Gas Field.22.3 Million
25Pakistan Petroleum LimitedWelding / Fabrication and Construction of 20” Dia  x 10 Kilometres  Water Pipeline from Dolly Check Post towards PPL Sui Field. Job includes ROW Preparation, Pipe Stringing, Excavation, fabrication, Welding, Radiographic Testing, Sand Blasting, Heat Hydro testing, Back filling, Pipeline Markers etc.22 Million
26Mari Petroleum Company LimitedFabrication, Construction Supply of Crude Oil Storage Tanks, Size: 40’x10’x8’ for EWT, Halini21.6 Million
27Mari Petroleum Company LimitedFabrication/ Construction & Supply of 24" Dia  x 05 Nos Knock Out Drum21.1 Million
28Mari Petroleum Company LimitedDesign/ Engineering/Fabrication/ Construction & Supply of 2x 3-Phase Separators for Bhitai-1 & SML-1    (Purchase Order No.7100009164).20.5 Million
29Mari Petroleum Company LimitedFabrication/ Construction & Supply of 05 Nos 24" Dia Knock Out Drum                                            (Purchase Order No.7100005343)19 Million
30Pakistan Petroleum LimitedConstruction / welding and installation of 6" dia buried feeder line for Adhi well-32 Adhi field.18.4 Million
31Pakistan Petroleum LimitedWater Storage Tank at PPL Sui Field, Civil Works, Erection, fabrication, Welding, Sand Blasting, Painting, Hydrotest, Soap Test, Vacuum Test, Air leak Test,16 Million
32Pakistan Petroleum Limited1x 50000 liters Condensate Settling Tank at PPL Sui Field & 1x 20000 litrs Diesel Storage Tank at KPS, Kashomore,  covering  Civil Works, Erection, Fabrication, Welding, Sand Blasting, Painting, Hydrotest, Soap Test, Vacuum Test, Air leak Test.10 Million
33Mari Petroleum Company LimitedMechanical Contractor for Hook Up of Jet Pump with Supply of 30K Diesel & Water Storage Tank at Ghuari Field.9.9  Million
34Mari Petroleum Company LimitedFabrication/ construction of 6" Pipeline& Surface Production Facilities at Mari Deep Well No.13 & Fabrication/ Construction/ Laying of 6000 Meters Long 8" Dia Flow Line from its Bhittai-1 Tie-in Point Well No.30 Tie-in Point Well NO.21 & 4.8.3  Million
35Mari Petroleum Company LimitedServices for Mechanical Contractor for Annual Turnaround (ATA) at Sujawal Gas Condensate Field, Sujawal.8.2 Million
36Pakistan Petroleum LimitedWater Storage Tank & Condensate Storage Tank at PPL Sui Field, Civil Works, Erection, fabrication, Welding, Sand Blasting, Painting, Hydrotest, Soap Test, Vacuum Test, Air leak Test,8 Million
37Mari Petroleum Company LimitedConstruction/ Fabrication of  2x 3000 bbls above ground vertical Condensate Storage Tanks at Mari Field, Daharki, covering  Civil Works, Erection, Fabrication, Welding, Sand Blasting, Painting, Hydro test, Soap Test, Vacuum Test, Air leak Test,.8 Million
38Pakistan Petroleum LimitedWelding / Fabrication and Construction of 20” Dia  x 5 Kms  Water Pipeline from KPS Kashmore towards PPL Sui Field. Job includes ROW Preparation, Pipe Stringing, Excavation, fabrication, Welding, Radiographic Testing, Sand Blasting, Installation of Heat Shrink Sleeves, Hydro testing, Back filling, Pipeline Markers etc.7 Million
39Mari Petroleum Company LimitedFabrication/ Construction & Supply of FLARE KOD for Sujawal-X1    (Purchase Order No.7100010371). Successfully completed.4.6 Million
40Pakistan Petroleum LimitedConstruction of Well Chain Link Fencing for Well Adhi-29.4.4 Million
41Mari Petroleum Company LimitedFabrication/ Construction & Supply of 01 Nos 24" Dia Knock Out Drum                                            (Purchase Order No.7100007428)4 Million
42Pakistan Petroleum Limited

Welding / construction of modification in WHSF spools for well Adam west x-1, Adam x-1, Shahdad, Kinza /

Fazl x-1 for Gambat & Hala field in Sindh.

4 Million
43Mari Petroleum Company LimitedDesign/ Engineering/Fabrication/ Construction & Supply of 1x  30,000 Liters Capacity Skid Mounted Tank Diesel Storage Tank &  Supply of 1x 30,000 Litres Capacity Skid Mounted Tank Water Storage for Halini Well No.1, Karack Block    (Purchase Order No.7100008001).3.5 Million
44Pakistan Petroleum LimitedFabrication / Welding / Installation of WHSF and final Tie-In at Well Adhi-10.2.7 Million
List of Equipment’s
S. No.

 

                             Description

 

Unit

 

             Qty

1Welding Plants 500 AmpereNos30
2Crane 71 TonNos1
3Crane 35 TonNos2
4Crane 5 TonNos3
5ExcavatorNos4
6Welding Rectifiers 500 AmpereNos80
7Crane Truck 3 TonNos4
8Pipe Layer ( Side Boom )Nos4
9Air Compressor 390 CFMNos4
10Hydrostatic Pump 3000psiNos6
11Dewatering Pump 90 GpmNos6
12Office Container 20x8x8Nos6
13Store Container 20x8x8Nos6
14Grinder Angle 9"Nos50
15Grinder Angle 7"Nos50
16Grinder Angle 5"Nos30
17Pencil GrinderNos30
18Genset ( 150KV, 90KV, 60KV & 45KV )Nos10
19Bevel MachineNos6
20Cutting SetNos12
21External Clamp ( 4" to 20" Dia )Set4
22Fabrication Clamp ( 4" to 20 Dia )Set4
23SpannerSet12
24Stacking Spanner ( 2" to 20" Dia )Set12